The kitchen is the room most homeowners in Chattanooga start with. The cabinets are tired, the layout does not work, and a contractor has quoted a start date three weeks out. In a house built before the 1980s, that start date is the moment the asbestos question has to be answered, because a kitchen remodel disturbs more old material in one week than most rooms see in fifty years.
Kitchens in homes from the 1950s through the 1970s were built with a lot of products that commonly contained asbestos. Nobody can tell by looking, which is why we test instead of guess.
Vinyl flooring and the black adhesive under it. The old sheet vinyl and the small square tiles are a classic. The mastic underneath, the black or yellow glue, is a separate material and is tested separately. See our page on asbestos floor tile for what we look for.
Textured or popcorn ceilings. Many kitchens got a sprayed or troweled texture. If your ceiling has one, read about popcorn ceiling testing before anyone scrapes it.
Joint compound and wall texture. Taking a wall down to open the kitchen to the dining room cuts straight through drywall seams and the compound used to finish them.
Backing behind a backsplash or wall panels. Cement board and some older paneling products were made with asbestos fibers.
Duct wrap and pipe insulation. These sit in the ceiling or the basement under the kitchen, and a new range hood or a moved sink touches them.
Intact asbestos materials that are left alone are generally not the problem. The problem starts when a crew sands, scrapes, drills or tears them out. That is when fibers become airborne and travel through the house, including through the HVAC returns. Once the dust is in the carpet and the ductwork, you are no longer deciding about a kitchen. You are deciding about the whole house.
There is also a practical side. If a test comes back positive in the middle of the job, your contractor stops, the schedule collapses, and you pay for the crew to stand around. If the test comes back positive before the job, you can plan around it, sometimes by leaving a material undisturbed, sometimes by having it professionally removed first, and either way you price the work with real information.
We walk the kitchen with you and your contractor's plan in hand. We only sample the materials that the project will actually disturb, so you are not paying to test things that stay put. Samples go to an accredited lab, and you get a written report that says which materials contain asbestos and which do not. That report is also what a licensed abatement contractor needs if removal is called for, and it is the paper your own contractor will want on file. Our pre-renovation inspection page covers the full scope, and you can compare costs on our testing cost guide.
The best moment to call is as soon as you have a contractor and a rough scope, and before you order cabinets or sign off on a demo date. Results usually come back fast enough that a start date does not need to move. If you are also planning to replace ductwork or the HVAC system while the ceiling is open, mention it, because we may want to look at the duct wrap at the same visit.
Buying the house and remodeling right after closing is just as common here. If that is you, our guide for buying an older home explains how to fold testing into your inspection period.
Tell us the age of the house and what you plan to take out, and we will tell you what needs sampling. Call (423) 414-2862 or use our contact page and we will schedule the visit around your contractor.
Free quotes over the phone in minutes. Lab results in 2–3 business days.
Call (423) 414-2862