A pipe lets go in the wall, a storm peels back a section of roof, or the water heater floods the hall closet. Within a day an insurance adjuster has been out, a restoration company has set up fans, and someone is telling you the drywall, flooring and ceiling in the affected rooms all have to come out. In a house built before the 1980s, that is the exact moment to stop and test, before anything gets cut, scraped or hauled to the curb.
Asbestos is not dangerous while it sits intact and dry. The trouble starts when the material is broken up. Wet, softened ceiling texture, joint compound, floor tile and pipe wrap all crumble more easily than dry material, and demolition crews pull them apart in bulk. Fibers get into the air, into the HVAC system if it is running, and onto everything in the house. Then a mitigation crew that was only supposed to dry the place out has spread a contamination problem across the whole floor plan.
Across the older neighborhoods in Chattanooga, from Brainerd and East Ridge to St. Elmo and North Shore, we see the same materials again and again:
None of these can be identified by looking at them. Only a lab can tell you, which is why samples come first.
Insurance claims move on a clock, and it is tempting to let the restoration company start right away. Our advice is to ask for a short hold on demolition in the affected rooms only. We can usually collect samples quickly, and lab results on a standard turnaround come back fast enough that the delay is measured in days, not weeks. If the results are negative, the crew carries on with a clean bill of health in writing. If a material is positive, you know before anyone is exposed and you can bring in a licensed abatement contractor for that area while the rest of the dry-out continues.
It also helps with the claim itself. Abatement of a confirmed material is a documented, line item scope of work. Contamination discovered after demolition is a much messier conversation with the carrier. Keep the lab report with your claim file either way.
We take bulk samples of the damaged and soon to be removed materials, and we can do air testing if demolition has already happened and you want to know where things stand. We test; we do not do the removal, which keeps our results independent. Our residential testing page explains the process, and the cost guide will help you decide how many samples make sense for the rooms involved.
Stop the water first. Shut off the supply, protect belongings, and get the dry-out going.
Do not scrape, sand or pull anything yet. Wet material is fragile. Leave ceilings, tile and wrapped pipes alone until they are sampled.
Turn off the HVAC in the affected area if you suspect old duct wrap or ceiling material has been disturbed.
Tell your restoration company the year the house was built and that you are testing. A good contractor will welcome it.
Call (423) 414-2862 with the age of the house and which rooms were hit. We will tell you what to sample and get you on the schedule right away.
Free quotes over the phone in minutes. Lab results in 2–3 business days.
Call (423) 414-2862